Virtual Flipbooks
Richardsville, Kentucky
Print Case Study
Owner:
Kentucky Transportation Cabinet, District 3 Office
Engineer:
Contractor:
Scott & Murphy, Inc.
Installation:
November 2010
Technical Description:
The Kentucky Transportation Cabinet needed to replace the KY 263 Highway Bridge in Richardsville, and worked with Contech Engineered Solutions to find a solution.
An Aluminum Box Culvert product was chosen for the project because it was a practical and cost-effective solution. The wide-span, low-rise shapes of an Aluminum Box Culvert are lightweight, as well as fast and easy to install.
Utilizing a product designed for quick installation was important to the Kentucky Transportation Cabinet, as one of the major challenges of the project involved the restricting of road closure to a maximum of 4 days.
The project team was able to meet this goal, as well as complete the design, fabrication and installation of the project in less than 60 days.
800-338-1122 | www.ContechES.com
© 2023 Contech Engineered Solutions LLC, a QUIKRETE Company