Owner:
City of Edgerton
Engineer:
Foth & Van Dyke
Contractor:
Zenith-Tech
Installation:
March 22, 2001
Technical Description:
The City of Edgerton planned improvements to Central Park which included a replacement bridge relocated downstream. Central Park is the community focal point of this town of 4,600, located between Madison and Milwaukee. The landscape architect designed cast-in-place, textured-finished concrete wingwalls and parapets to enhance the CON/SPAN® bridge. Antique light poles and fixtures add to the distinctive, turn-of-the-century look.
“We think it looks great and the City loves it” said Gil Jevne, ASLA, Project Manager with Schreiber-Anderson Associates of Madison.