Design Center mobile

St. Andrews Plantation

Wake Forest, North Carolina

Roadway

Owner:

City of Wake Forest

Engineer:

Bass Nixon Kennedy

Contractor:

CC Magnum

Installation:

September 15, 2003

Technical Description:

  • Width: 39 - ft.
  • Span: 85 - ft.
  • Style: Capstone®
  • Finish: Weathering Steel
  • Decking: Concrete

Gaining access from an existing residential subdivision to a newly constructed subdivision is now being required by many municipalities due to traffic flow volumes and ease of access for emergency vehicles. This Contech truss bridge was selected for the St. Andrews Plantation to meet these requirements but also can add aesthetic value to newly developed lots. This Capstone® style truss bridge provided the City of Wake Forest a solution that makes the new subdivision attractive to potential home buyers.

 

Technical Description:

  • Width: 39 - ft.
  • Span: 85 - ft.
  • Style: Capstone®
  • Finish: Weathering Steel
  • Decking: Concrete
logo

800-338-1122 | www.ContechES.com

product-logo

© 2023 Contech Engineered Solutions LLC, a QUIKRETE Company