Design Center mobile

Clemson University (ICAR)

Greenville, South Carolina

Environmental

Owner:

City of Greenville, Clemson University

Engineer:

URS Corporation

Contractor:

Morgan Corporation

Installation:

September 2005

Technical Description:

  • Span: 72-ft. 65-ft. 11-in. (2),34-ft. 8.5-in.
  • Rise: 10-ft. 2-in. 19-ft. (2), 9-ft.2-in.
  • Length: 113-ft. 92-ft 100-ft. 73- ft.

The City of Greenville and URS Corporation collaborated on four bridge crossings to help satisfy demanding Federal Emergency Management Agency (FEMA) compliances for minimizing wetland and stream impacts. The design solution spanned the wetlands with 66-ft. 72-ft. and 36-ft. BEBO® arch structures. This was the first BEBO® project to use the new T-Series size arch in order to meet difficult clearance requirements. A cultured stone veneer was adhered to the Keystone® modular retaining blocks to add an aesthetic appeal.

The International Center for Automotive Research (ICAR) Park in Greenville is expected to change the economic landscape of not only the upstate region but also the state. The Park is designed to be an innovation center for the southeast automotive industry and is projected to make a global impact on the automotive industry as a whole. The campus is a joint venture between Clemson University, BMW and the state of South Carolina.

 

Technical Description:

  • Span: 72-ft. 65-ft. 11-in. (2),34-ft. 8.5-in.
  • Rise: 10-ft. 2-in. 19-ft. (2), 9-ft.2-in.
  • Length: 113-ft. 92-ft 100-ft. 73- ft.
logo

800-338-1122 | www.ContechES.com

product-logo

© 2023 Contech Engineered Solutions LLC, a QUIKRETE Company