A coal mining operation in North America chose polymer coated corrugated metal pipe (CMP) for a haul road installation through a flood plain. CMP was chosen because it provided the most economical and durable solution for the mining company when compared with the alternatives.
Mobile CMP manufacturing technology was utilized to produce the pipe onsite, eliminating the need for outside trucking and transportation. The project contractor installed 12,000 feet of 120 inch diameter, 12 gage CMP on schedule.