Louisville, Kentucky
Print Case Study
Owner:
NTS
Engineer:
Sabak, Wilson and Lingo
Contractor:
Flynn Brothers BEBO
Installation:
October 2004
Technical Description:
This 24-foot span BEBO® concrete arch bridge, nestled in the Lake Forest Subdivision, has 15-ft. of fill above the crown of its arch. The rise of the BEBO E24 arch enabled the contractor to shorten the structure relative to the originally proposed structure. As a result, material costs were reduced and installation time was minimized.
Engineers were able to design a Mechanically Stabilized Earth (MSE) wall system for this hydraulic application. Homeowners of the Lake Forest Subdivision can now enjoy a structurally efficient bridge that offers an aesthetic appeal to its surroundings.