Virtual Flipbooks
Chicago, Illinois
Print Case Study
Owner:
City of Chicago
Engineer:
Contractor:
R. Rudnick Co.
Installation:
July 19, 1996
Technical Description:
This $1.2 million multi-span bridge replacement in historic Garfield Park, Chicago, is an excellent example of the blending of architectural precast concrete with structural precast concrete.
The CON/SPAN® bridge structure was built on schedule and within budget, three 28-foot spans extended 150 feet in total length. The structure also serves as a pedestrian underpass in the public park.
800-338-1122 | www.ContechES.com
© 2023 Contech Engineered Solutions LLC, a QUIKRETE Company