Virtual Flipbooks
Lake Buena Vista, Florida
Print Case Study
Owner:
Walt Disney World
Engineer:
Post, Buckley, Schuh, & Jernigan Inc.
Contractor:
Hubbard Construction
Installation:
October 21, 1994
Technical Description:
This triple-cell installation features curved alignment, architectural treatment, precast flushed wingwalls and detached headwalls. The bridge, marking the eighth CON/SPAN® installed on Disney properties, provides access to the Disney Boardwalk Resort, located on Lake Buena Vista.
The structure is a focal point for the facility and provides the entrance to Disney’s Boardwalk Resort. The resort features a replica of the Atlantic City Boardwalk, and the bridge design complements the theme of the resort.
800-338-1122 | www.ContechES.com
© 2023 Contech Engineered Solutions LLC, a QUIKRETE Company