Virtual Flipbooks
Prior Lake, Minnesota
Print Case Study
Owner:
Wensmann Homes
Engineer:
Pioneer Engineering
Contractor:
Ryan Contracting Co. / Kelleher Construction, Inc.
Installation:
November 2005
Technical Description:
This residential subdivision utilized a BEBO® E-Series bridge for a stream crossing that could also provide an aesthetic solution for the community. The owner wanted a decorative wall system in conjunction with a vehicular barrier.
The resulting structure includes a beautifully crafted New England Drystack formliner finish that was followed with the staining of the individual stone patterns to mimic a real stone veneer. Each pilaster is designed with recessed formliner panels and provides support for street light posts mounted to the top. The structure also includes a decorative handrail for pedestrians to cross the bridge on either side of the road.
800-338-1122 | www.ContechES.com
© 2023 Contech Engineered Solutions LLC, a QUIKRETE Company