Virtual Flipbooks
Warren, New Hampshire
Print Case Study
Owner:
Town of Warren
Engineer:
SEA Consultants
Contractor:
Bayview Construction
Installation:
Summer 2003
Technical Description:
This twin 12’ span by 8’ rise Aluminum Structural Plate bridge was installed in the summer of 2003 as a bridge replacement. It was funded by the Town of Warren and New Hampshire Department of Transportation Bridge Aid Program.
The structure accommodates fish passage with the twin Aluminum Structural Plate horizontal ellipses with buried inverts that are three feet below the natural stream.
800-338-1122 | www.ContechES.com
© 2020 Contech Engineered Solutions LLC, a QUIKRETE Company