Virtual Flipbooks
Gillette, Wyoming
Print Case Study
Owner:
Jacobs Ranch
Engineer:
C.E. & M.T.
Contractor:
Osborne Brothers Construction
Installation:
Summer 2005
Technical Description:
The Jacob’s Ranch Mine needed to add a third rail line and accomplished the feat by extending the MULTI-PLATE ® SUPER-SPAN at the entrance to the mine.
800-338-1122 | www.ContechES.com
© 2022 Contech Engineered Solutions LLC, a QUIKRETE Company