Virtual Flipbooks
Napa, California
Print Case Study
Owner:
Codorniu Napa, Inc. Winery
Engineer:
Jim Cassayre
Contractor:
Wright Contracting, Inc.
Installation:
September 21, 1989
Technical Description:
Codorniu Napa, Inc. Winery needed a bridge structure for a roadway overpass and chose a 24’ x 8’ x 40’ CON/SPAN® Bridge System from Contech for the solution.
The installation incorporated pedestal walls with a fractured finish, increasing the rise in order to accommodate truck traffic through the underpass/overpass.
800-338-1122 | www.ContechES.com
© 2022 Contech Engineered Solutions LLC, a QUIKRETE Company