Careers Contact Us
Start A Project mobile

Explore

Contech Solutions


Featured Video


Latest from

Our Blog


3 Ways to Improve Teamwork & Streamline Your Next Project!

“Wow, I don’t even know what you all do but I’d like to work for a company like that!” said the waitress after she overheard the team recounting short stories and expressing gratitude for each other at dinner post end of year training. Well, “We sell culvert pipe” is not what she expected to hear, and everyone doubled over laughing. Not a single

A Balancing Act

As engineers in the pipe industry, we see the results of a lot of pipe projects.  Fortunately, the vast majority of the installations are successful and result in round pipes that are well supported by the backfill around them.  However, occasionally pipe installations don’t follow the recommended techniques and result in distorted pipes.Although

READ FULL BLOG
Top 2 Benefits of High-Rate Biofiltration

High-rate biofiltration differs from traditional bioretention in that it has been optimized for high volume/flow treatment and high pollutant removal. Traditional bioretention footprints with typical design flow rates of 1-12 inches per hour can occupy up to 10% of the contributing impervious drainage area. In addition, the individual components of

12” of Cover? That’s it?

As previously discussed in our “Construction Cover vs. Post Construction Cover” blog post, the total cover required for a system is the combination of the pavement, measured from the bottom of flexible pavement or top of rigid pavement, the granular road base, and the backfill material. But is 12” really enough post construction cover for your CMP

READ FULL BLOG