Steadfast EXPRESS™ Pedestrian Bridge

Steadfast EXPRESS PedestrianTruss Speed, Quality and Value

The Steadfast EXPRESS bridge is a pre-engineered pedestrian steel truss bridge designed for owners, engineers and contractors who know “time is money.” This standardized truss system provides stamped drawings within three business days after receipt of order and a bridge in less than six weeks, significantly reducing construction time.

The speed, quality and value of Steadfast EXPRESS™ bridges will ensure you receive the industry’s best customer experience. For over thirty years, CONTECH’s Steadfast Bridges have been known as premier steel truss structures - depended upon for strength and durability as well as aesthetic appeal and economical solutions.

Benefits of EXPRESS Pedestrian Structures:

  • Stamped Drawing - within 3 business days.
  • Bridge Delivery - within 6 weeks of approved drawing.
  • Support - Assistance by local CONTECH Field Professional.
  • Experience - We have registered PEs in every state and 75 years of experience to help with regulations and codes on even the most challenging projects.
  • Quality - We maintain the highest level of manufacturing certifications in the industry – making sure that the job is done right the first time.

To download a request form that can be submitted to your local Sales Representative, click here.

SS Credit 1 – Site Selection, 1 Point

Intent – Avoid the development of inappropriate sites and reduce the environmental impact from the location of a building.

Potential Contribution: Bridge and Structures

  • Long clear spans allow you to cross sensitive areas with little or no impact
  • Maintain a 50-foot buffer on either side of the waterway

SS Credit 2 – Development Density and Community Connectivity, 2-5 Points

Intent – Channel development to urban areas with existing infrastructure, protect greenfields and preserve habitat and natural resources.

Potential Contribution: Bridges and Structures
  • Connect people and services over roads, under rail crossings and across streams
  • Shorten walking distance to basic services
  • Provide aesthetic solutions

SS Credit 4.1 – Alternative Transportation, Public Transportation Access, 1-6 Points

Intent – Reduce pollution and land development impacts from automobile use.

Potential contribution: Bridges and Structures
  • Create bicycle trail connectivity - allowing alternative transportation mode
  • Create shorter, safer pedestrian access to public transit
  • Bring public transportation (i.e. railway) into a community with minimal impact to existing roads and grades

MR Credit 4 – Recycled Content, 1-2 Points

Intent – Increase the demand for building products that incorporate recycled content materials. The sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes at least 10% (1 point) or 20% (2 points), based on cost, of the total value of the materials in the project.

Potential Contribution: CONTECH Metal Pipe and Structures
  • Steel is the most recycled material in the world
  • Up to 80% recycled content

MR Credit 5.1 – Regional Materials, 1-2 Points

Intent – Increase demand for building materials and products that are extracted and manufactured locally to a job site in hopes to reduce the environmental impact that would result from transporting these goods. Products manufactured, extracted and recycled within 500 miles of the project site for a minimum of 10% (1 point) or 20% (2 points), based on cost of the total materials value.

Potential Contribution: All Contech Products
  • 40 manufacturing facilities nationwide Contact your local representative to find out if your project location falls within our reach
For a list of all project profiles in your area, visit your local resource page.  

 

Steadfast EXPRESS Truss Bridge Projects


 
 

Related Products >>

Precast Abutment System