Stonefield Mixed-Use Development
Albemarle County, Virginia - In Albemarle County, near Charlottesville, Virginia, a large neighborhood model development is completing Phase One construction of a 65-acre site. Stonefield, this 270,000-square-foot retail center with a central plaza and 245 residential units, is scheduled to open in late 2012.
The original site plans included nearly 1,200 LF of 30-ft. retaining wall that was necessary to construct two stormwater management ponds. A significant investment was required for the stormwater management portion of the project. So the owner, South Carolina-based Edens, and engineer WW Associates, worked
with Contech Engineered Solutions for a more cost-effective solution.
After reviewing multiple Contech stormwater management products, a treatment train that uses Best Management Practices (BMPs) through integration of pretreatment, detention and treatment was chosen. This solution not only met all regulatory needs and allowed the developer to retain more usable land than
alternatives, it even reduced the cost estimate of constructing the ponds by one third.
The Contech stormwater management system included:
• A corrugated metal pipe (CMP) underground detention system engineered from 2,411 LF of 138” diameter, 10-gage, Aluminized Steel Type 2 (ALT2) pipe
• A StormFilter™ 8’ x 10’ x 48’ box culvert comprised of 98 filter cartridges, using a variety of sustainable media to remove challenging pollutants
• A Vortechs® 3000 hydrodynamic separator – a high-performance, low-energy swirl-chamber system ideal for very fine sediment removal (down to 50 microns); two temporary sediment basins with outfall pipe
With this stormwater treatment train solution, Contech reduced both production time and logistical costs for the site contractor, Faulconer Construction of Charlottesville, during the early project construction. This was accomplished, in part, by utilizing the Contech Mobile Production Vehicle (MPV®) where Contech manufactured most of the CMP detention pipe on the project site within just five days.
The Contech MPV is designed to be an intermodal, self-supporting factory used for quick deployment to produce CMP with diameters from 3’ to 16’, and up to 35’ long, that are ready for installation in as few as four hours. Using the same quality construction levels as Contech plant-manufactured products, the MPV is ideal for remote job sites; projects requiring large continuous pipe production, such as windmill foundation forms, vertical shafts or caissons; support for immediate rebuilding and deployment following a natural disaster; and sites with limited storage space or restricted traffic patterns, including mines, military bases or airports.
Owner
Edens
www.edens.com
Engineer
WW Associates
www.wwassociates.net
Contractor
Faulconer Construction
www.faulconerconstruction.com
|

Contech's Mobile PIPE MPV Makes Corrugated Metal Pipe Onsite to Reduce Project Cost and Time

Aerial of Entire Project Site

Installation of Corrugated Metal Pipe

Backfilling of Corrugated Metal Pipe
|